DTECH 2027

Event playbook 2027 edition · 8 chapters

Energy projects and infrastructure

Plan a utility digital-system evaluation around an operating interface. Use a worked brief, comparison criteria and a downloadable worksheet.

Lensmor field notes2027 edition
Conceptual illustration of an open research notebook, itinerary cards and a compass
Research with purpose.Plan a better conversation.
Atlanta

March 1–4, 2027

Georgia World Congress Center

Add this location to calendar

Official dates · Checked Oct 17, 2026

Industry & professional research

Compare pass options

Check organizer registration for available passes and included sessions.

Check official pass inclusions

Prices retain the source checks shown in Registration below.

Confirm current availability and pass inclusions before booking.

Is it a fit?

Plan a utility digital-system evaluation around an operating interface.

DTECH supports transmission and distribution technology research. A useful company review starts with the utility or network workflow, then identifies equipment, data and integration capabilities relevant to that application.

Aim to produce: A utility integration and commissioning brief. The comparison below helps you decide what to investigate, which evidence to request and when to advance an option.

Research context

Explore the ecosystem, with context.

These figures describe Lensmor research coverage for the matched event record. They are not organizer registrations or an official attendance total.

Available in LensmorData read Oct 16, 2026
529Exhibitor recordsEvent company relations
2,592Attendee research profilesEvent-related profiles · Synced Oct 16, 2026

Research coverage does not certify registration or future attendance.

Industry mix

50-record visible preview

Largest stored industry groups within this research scope.

Appliances, Electrical, and Electronics Manufacturing11
Electric Power Transmission, Control, and Distribution6
Software Development5
IT Services and IT Consulting4

Counts cover 50 visible records, not all 529 event records. The preview is not a representative survey.

Companies to start with

Illustrative records

TESSCO Technologies

TelecommunicationsUnited States

The H-J Family of Companies

Appliances, Electrical, and Electronics ManufacturingUnited States

Tech Products Inc

Electric Power Transmission, Control, and DistributionUnited States

Selected across different returned industries; not a ranking, an official roster or proof of attendance.

Explore event researchReview available coverage and assess relevance.
Programme resources

Use resources from the correct edition.

Keep the year and location attached to programme, exhibitor and learning materials. An organizer homepage may now describe another edition; a company research record does not establish participation, access or meeting availability.

Official edition resources

Check the edition and location in the organizer’s programme before selecting a session or relying on access.

Four ways to test the fit

Lensmor’s suggested research framework for energy projects and infrastructure. These are evaluation lenses, not an organizer’s session list or confirmed exhibitor capabilities.

01

Project boundary

Define capacity requirements, operating conditions and the customer or asset served.

Evidence to requestA technical concept with assumptions and system boundaries.

Leave withA project requirements and dependency map.

02

Performance evidence

Compare delivered output, efficiency and availability at the same operating point.

Evidence to requestTest methods and performance conditions for the proposed configuration.

Leave withA like-for-like technical comparison.

03

Integration and delivery

Map interconnection, site works, controls and delivery responsibilities.

Evidence to requestAn interface schedule and commissioning scope.

Leave withA delivery plan with unresolved interfaces.

04

Commercial exposure

Separate equipment cost, operating inputs, service and contractual assumptions.

Evidence to requestA scoped cost model and allocation of operational responsibilities.

Leave withA scenario comparison with major sensitivities.

Suggested research questions

Work through a concrete decision.

Illustrative exercise: A utility team is comparing asset-data and control integration approaches. This is a preparation framework, not a report of an actual purchase, experiment or meeting.

Define the hard constraint

Reliable data handoffs and named control responsibilities.

Next step Write the condition that would exclude an option before collecting alternatives. Keep desirable features separate from that condition.

Ask for the deciding evidence

A system interface demonstration and operational fallback scope.

Next step Use the same brief and demonstration conditions for each option; record exactly what was tested.

Make the next step explicit

A utility integration and commissioning brief.

Next step Assign an owner, request a scoped trial or proposal, and leave unverified options in a separate watchlist.
Explore relevant event research →
Your research workflow

Leave with a comparison you can act on.

Keep the requirement, source material, evaluation and follow-up in one file. The worksheet below starts with this edition’s brief and leaves unverified findings blank.

Conceptual planning illustration: focus, connect and follow through
PrepareConnectFollow through
  1. 01

    Write the boundary

    Write your actual operating or research context. Separate a requirement that would exclude an option from a preference you could trade off.

  2. 02

    Build a capability shortlist

    Start with edition-labelled organizer resources and the scoped company records above. Identify a specific capability and the organization responsible for it.

  3. 03

    Resolve one evidence gap

    For the claim that would change your decision, save the original source, its edition, method or configuration, and the condition you still need to verify.

  4. 04

    Assign the follow-through

    Agree on a specific document, demonstration, reading task or trial. Save the responsible person and the review point so that the next discussion resolves an open question.

A comparison you can use after DTECH 2027

Keep one row per organization and specific capability or piece of research. Reuse the same decision criteria when you compare alternatives.

Pass the boundary test

Condition to resolveWrite the context, required capability and the condition that would rule an option out.

Decision ruleKeep an unresolved hard constraint out of the qualified shortlist. Record what evidence could change that decision.

Separate claim from evidence

Material to recordSave the original URL, edition, author or organization, and the method or configuration behind the statement.

Decision ruleLabel each statement as source material, a demonstrated result or your own validated observation. Save its context and limitations.

Check the next handoff

Output to agreeName the document, trial, reading task or specialist discussion that will resolve the next open question.

Decision ruleAssign a person and a specific next artifact. An interesting conversation becomes actionable when that handoff is clear.

Take it into your workflow

DTECH 2027 research worksheet

A CSV prefilled with this research brief and the four comparison lanes. Organization, evidence, fit and follow-up fields are blank for your own research. No signup required.

Download worksheet

Two follow-ups with a clear request

Replace the bracketed details and remove anything that does not match your context.

Request a comparable demonstration

We are comparing options in the context of DTECH 2027. Our requirement is [specific use case], with this constraint: Reliable data handoffs and named control responsibilities. Could you share [the relevant specification or evidence] and show [one representative task] using our stated conditions?

Ask for a scoped next step

Our intended output is: A utility integration and commissioning brief. Before arranging a broad meeting, could you confirm [capability, implementation boundary and responsible role], list [the relevant exclusions or dependencies], and suggest [a bounded trial or comparable proposal]?
Before booking

Registration and access

Confirm the location, pass and included sessions in the official registration flow. Saved prices below are source records, not a live checkout quote.

Complete current pricing has not been verified for this guide. Check the organizer before relying on an amount.

Check official registration
Planning essentials

Frequently asked questions

When and where is DTECH 2027?

Atlanta: March 1–4, 2027 at Georgia World Congress Center.

What should I ask before comparing organizations?

A system interface demonstration and operational fallback scope. Keep the method, configuration and context attached to the answer.

What should I leave with after researching DTECH 2027?

A utility integration and commissioning brief. Record unresolved constraints separately from demonstrated capabilities.

Are the Lensmor figures official attendance counts?

These figures describe Lensmor research coverage for the matched event record. They are not organizer registrations or an official attendance total. Research profiles do not certify a person’s registration, attendance or meeting availability.

Sources and further reading

Check the details behind your research.

Independent Lensmor guide. Editorial advice is separate from organizer facts. Source dates describe saved reads, not a whole-page verification today.